- Home
- Government
- Planning Board
- Projects
Projects
Al's Yard Salvage & Auto
Bellefield Phase II Final Development Plan Main Street
- 24 May 2023 Inn at Bellefield SIGNAGE 15 W Dorsey Ln, Hyde Park, NY 12538 (PDF)
- 24 May 2023 Bellefield Phase II FINAL Sign Design Manual (PDF)
- 4 April 2023 Bellefield FDP SWPPP(PDF)
- 4 April 2023 Bellefield FDP Elevations (PDF)
- 4 April 2023 Bellefield FDP Civil Plan Set (PDF)
- 27 April 2023 Bellefield FDP Sign Design Manual (PDF)
- 14 March 2023 Bellefield Bellefield FDP Phase II Sign Manual (PDF)
- 14 March 2023 Bellefield Bellefield FDP Phase II Elevation Plan Set (PDF)
- 14 March 2023 Bellefield Bellefield FDP Phase II Cover Letter (PDF)
- 14 March 2023 Bellefield Bellefield FDP Phase II Civil Plan Set (PDF)
- 14 February 2023 Bellefield Phase II FDP TRAILS MAP (PDF)
- 14 February 2023 Bellefield Phase II FDP REFUSE PLAN (PDF)
- 14 February 2023 Bellefield Phase II FDP PARKING PLAN (PDF)
- 14 February 2023 Bellefield Phase II FDP Elevations Details (PDF)
- 14 February 2023 Bellefield Phase II FDP Construction Phasing Plan (PDF)
- 14 February 2023 Bellefield Phase II FDP 00.Cover Letter 02.13.23 (PDF)
- 14 February 2023 Bellefield Phase II FDP Sign Manual 12.28.22 (PDF)
- 14 February 2023 Bellefield Phase II FDP Bellefield Plan Set 02-13-23 (PDF)
- 6 January 2023 Bellefield PUD Phase II Sign Manual (PDF)
- 17 January 2023 Bellefield Phase II FDP Amended Site Plan (PDF)
- 17 January 2023 Bellefield Phase II FDP Amended Trails and Recreation Map (PDF)
- 17 January 2023 Bellefield Phase II FDP Cover Letter - SEQRA Responses (PDF)
- 17 January 2023 Bellefield Phase II FDP Stors Associates Memo (PDF)
- 17 January 2023 Bellefield Phase II FDP Traffic Impact Study (Introduction Only) 06-21-2017 (PDF)
- 17 January 2023 Bellefield Phase II FDP Amended Landscaping Plan (PDF)
- 13 January 2023 Bellefield Phase II Preliminary Plat ODA Road Sections (PDF)
- 13 January 2023 Bellefield Phase II Preliminary Plat Drawings from Labella rev2 (PDF)
- 13 January 2023 Bellefield Phase II Preliminary Plat Cover Letter Responses (PDF)
- 21 December 2022 Bellefield Phase II SD Preliminary Plat (PDF)
- 20 December 2022 Bellefield FDP Phase II TRAIL PLAN-FIG 3 (PDF)
- 20 December 2022 Bellefield FDP Phase II Response to DC Planning (PDF)
- 20 December 2022 Bellefield FDP Phase II REFUSE PLAN (PDF)
- 20 December 2022 Bellefield FDP Phase II PKNG PLAN (PDF)
- 20 December 2022 Bellefield FDP Phase II City Winery Elevations (PDF)
- 20 December 2022 Bellefield FDP Phase II C131 Site Plan (PDF)
- 20 December 2022 Bellefield FDP Phase II C130 Site Plan (PDF)
- 2 December 2022 Bellefield FDP submission Full Plan Set with revisions added (PDF)
- 2 December 2022 Bellefield FDP submission Plan Set Revised sheets only (PDF)
- 2 December 2022 Bellefield FDP submission ODA Road Sections (PDF)
- 2 December 2022 Bellefield FDP submission Parking Plan (PDF)
- 16 November 2022 Bellefield Phase II FDP Meeting Presentation (PDF)
- 3 November 2022 Bellefield Phase II FDP 6d.Buildings 500-600 (PDF)
- 3 November 2022 Bellefield Phase II FDP Parking Plan (PDF)
- 3 November 2022 Bellefield Phase II FDP Cover Letter (PUD)
- 3 November 2022 Bellefield Phase II FDP 6c.Buildings 100-200 (PDF)
- 3 November 2022 Bellefield Phase II FDP 6b.Main Street Looking East (PDF)
- 3 November 2022 Bellefield Phase II FDP 6a.Full Site (PDF)
- 3 November 2022 Bellefield Phase II FDP 5.Design Option Sheet (PDF)
- 3 November 2022 Bellefield Phase II FDP 04.Sample Blocks showing 500 ft lengths of Buildings (PUD)
- 2 November 2022 Bellefield Phase II Final Development Plan Set (PDF)
- 2 November 2022 Bellefield Phase II Final Development Plan Architectural Elevations (PDF)
- 28 October 2022 Bellefield 2022 Building Outlines Model (PDF)
- 28 October 2022 Bellefield Phase II C130 (PDF)
- 28 October 2022 Bellefield Phase II C131 (PDF)
- 28 October 2022 Bellefield Phase II OVERALL KEY PLAN (PDF)
- 28 October 2022 Bellefield Phase II SWPPP (PDF)
- 19 October 2022 Bellefield Phase II Presentation to PB final amended (PDF)
- 28 September 2022 Phase II 2022-09-27 ODA Road Sections 09.27.22 (PDF)
- 28 September 2022 Phase II Trrails Map (PDF)
- 28 September 2022 Phase II Subdivision Sketch Plan Application with Findings Statement 09.25.22 (PDF)
- 28 September 2022 Phase II SEAF (signed) 09.27.22 (PDF)
- 28 September 2022 Phase II Parking plan (PDF)
- 28 September 2022 Phase II LMV Elevations 9.27.22 (PDF)
- 28 September 2022 Phase II Full Plan Set 09.27.2022 (PDF)
- 28 September 2022 Bellefield Phase II Filed Maps 09.27.22 (PDF)
- 5 July 2022 Bellefield Phase II FDP presub 2021 Concept Plan (PDF)
- 5 July 2022 Bellefield Phase II FDP presub Cover Letter (PDF)
- 5 July 2022 Bellefield Phase II FDP presub EAF SEQRA Findings (PDF)
- 5 July 2022 Bellefield Phase II FDP presub Elevations (PDF)
- 5 July 2022 Bellefield Phase II FDP presub Parking (PDF)
- 5 July 2022 Bellefield Phase II FDP presub Plan Set (PDF)
- 5 July 2022 Bellefield Phase II FDP presub Renderings (PDF)
Bellefield at Hyde Park Amended Concept Plan for Saint Andrews PUD
- Site Walk 10-20-2021 Drone Photos
- November 2021 Bellefield Wetlands Map (PDF)
- 20 October 2021 Planning Board Meeting Presentation Bellefield Amended Concept Plan (PDF)
- 16 November 2021 Revised Narrative Bellefiled Amended Concept Plan (PDF)
- 16 November 2021 Revised Bellefield Amended Concept Plan Sheets (PDF)
- Final RESOLUTION 2020-29A Adopting Amended Findings statement 12.08.2021 FINAL ADOPTED (PDF)
- Amended Findings Statement 12.8.2021 Adopted (PDF)
- PB Report and Recommendations to TB MD(5034225.4) (PDF)
- 11 November 2021 Revised Design Guidelines Bellefield Amended Concept Plan (PDF)
- Memo Dec 7 - Bringdown Analysis for Housing - TRex Hyde Park Owner (PDF)
- 11-17-2021 Planning Board Meeting - Bellefield Presentation (PDF)
- 10 Bellefield Weitzman Residential Market Study (Final)-04-30-21 (PDF)
Bellefield F K A St. Andrews
- Inn at Bellefield signed SP garbage enclosure details
- Signed Site Plan Set Inn at Bellefield 12.07.2018
- Inn at Bellefield Site Plan Waiver PowerPoint Presentation 02.02.2022 (PDF)
- A2.1 A2.2 Elevations-18106-A2.2 (PDF)
- A2.1 A2.2 Elevations-18106-A2.1 (PDF)
- 17 December 2019 Inn at Bellefield SP Amendment Ext Mod (PDF)
- 17 December 2019 Inn at Bellefield SP Amendment Ext Mod (PDF)
- 6 81235.02 Noisemitigationplan November 20, 2017 (PDF)
- 7 November 17, 2017 FEAF with Figs and Attachments (PDF)
- October 18, 2017 Rendered Elevations Front Rear (PDF)
- October 18, 2017 Renderings 3 4 (PDF)
- 3 November 17, 2017 Plans (PDF)
- 4 1 Swppp Compiled Swppp November 17, 2017 (PDF)
- June 30, 2017 Traffic Impact Bellefield St. Andrews Property 2017 4 SD SP (PDF)
Bellefield WWTF Expansion
- 21 April 2021 Bellefield WWTF Expansion Revised Site Plan (PDF)
- 21 April 2021 Bellefield WWTF ExpansionSEAF Combined (PDF)
- 24 March 2021 Bellefield WWTF Exterior Elevation (PDF)
- 24 March 2021 Bellefield WWTF 2021 PROPOSED OPEN SPACE LAYOUT (PDF)
- 24 March 2021 Bellefield WWTF 2007 PROPOSED OPEN SPACE LAYOUT (PDF)
- 24 March 2021 Bellefield WWTF WWTP Site Plan Set (PDF)
- 24 March 2021 Bellefield WWTF Bellefield WWTP SEAF Combined (PDF)
- 22 January 2021 Bellefield WWTF SP Amendment SD SWPPP adendum (PDF)
- 22 January 2021 Bellefield WWTF comparison and EAF (PDF)
- 22 January 2021 Bellefield WWTF SP Amendment Plan Set (PDF)
Camp Victory Lake Master Plan Phase 1
- 15 May 2023 Camp Victory Lake Master Plan Sheet (PDF)
- 15 May 2023 Camp Victory Lake Cover letter (PDF)
- 15 May 2023 Camp Victory Lake Site Plan Set Pavilion Improvement Plan (PDF)
- 15 May 2023 Camp Victory Lake Auditorium Pavilion Improvements Photo Log (PDF)
- 4 April 2023 Camp Victory Lake THE LODGE RENDERINGS (PDF)
- 4 April 2023 Camp Victory Lake SWPPP (PDF)
- 4 April 2023 Camp Victory Lake SEQR Narrative (PDF)
- 4 April 2023 Camp Victory Lake Master Plan Set Sheets 0-4 (PDF)
- 4 April 2023 Camp Victory Lake LODGE Elevations (PDF)
- 4 April 2023 Camp Victory Lake Cover Letter (PDF)
- 4 April 2023 Camp Victory Lake Site Plan Set Sheets 0-23 (PDF)
- 4 April 2023 Camp Victory Lake SEQR Narrative w Traffic Appendicies (PDF)
- 4 April 2023 Camp Victory Lake FEAF (PDF)
- 3 Febrauary 2022 CVL FEAF revised (PDF)
- 3 February 2022 CVL Master Plan Set Sheets 1-2 (PDF)
- 3 February 2022 CVL Site Plan Set Sheets 0-19 (PDF)
- 3 February 2022 CVL Building Location Modification Exhibit (PDF)
- 3 February 2022 CVL Project SEQR Narrative- Compiled (PDF)
- 3 February 2022 CVL Response Letter dated 02.02.2022 (PDF)
- 3 February 2022 NEC CAMP VICTORY LAKE THE LODGE RENDERINGS_11-17-21 (PDF)
- 7 October 2021 response memo (PDF)
- 7 October 2021 CVL Site Plan Set Sheets 0-16 (PDF)
- 7 October 2021 CVL SEQR Narrative Compiled (PDF)
- 7 October 2021 CVL Master Plan Set Sheets 1-4 (PDF)
- 7 October 2021 CVL Building Concept Renderings 1-4 (PDF)
- 7 October 2021 CVL Ph. 1 SWPPP (PDF)
- 7 October 2021 CVL FEAF (PDF)
- 7 October 2021 CVL Exterior Building Elevations (PDF)
- 17 August 2021 CVL SWPPP (PDF)
- 17 August 2021 CVL Visual Analysis - Sheets 1-2 (PDF)
- 17 August 2021 CVL Site Plan Set - Sheets 1-15 (PDF)
- 6 July 2021 CVL - Preliminary Building Renderings 1-4 (PDF)
- 6 July 2021 CVL Site Plan Set - Sheets 3-4 (PDF)
- 6 July 2021 CVL - Exterior Elevations (PDF)
- 6 July 2021 2-CVL - grading Utilities (PDF)
- 6 July 2021 1-CVL - Site Plan (PDF)
- 20 April 2021 CVL Master Plan Existing Conditions (PDF)
- 20 April 2021 CVL Master Plan (PDF)
- 20 April 2021 CVL Site Plan Grading Plan Alternate Position (PDF)
- 20 April 2021 CVL Site Plan Alternate Position (PDF)
- 22 Dec 2020 CVL Site Plan Set (PDF)
- 22 Dec 2020 CVL Master Plan Set (PDF)
- 22 Dec 2020 CVL Creighton Manning Traffic Report (PDF)
- 22 Dec 2020 CVL MP Water Engineering Report (PDF)
- 22 Dec 2020 CVL MP Sewer Engineering Report (PDF)
- 22 Dec 2020 CVL Prelim SWPPP
- 31 Dec 2018 Camp Victory Lake Master Plan Alternative 2 (PDF)
- 18 Dec 2018 Camp Victory Lake Site Plan Version 2 (PDF)
- Camp Victory Lake Master Plan Phase 1 Site Plan Set Sheets 1-8 10.23.2018 (PDF)
- Camp Victory Lake Master Plan Phase 1Rendering Front 10.23.2018 (PDF)
- Camp Victory Lake Master Plan Phase 1Rendering 10.23.2018 (PDF)
- Camp Victory Lake Master Plan Phase 1 Sheets 1-3 10.23.2018 (PDF)
Carriage Trails f.k.a. Crofton Mews
Culinary Institute of America N & S Entry Gates
- 28 April 2023 CIA revised MasterPlan (PDF)
- 4 April 2023 CIA Entry Cover Letter (PDF)
- 4 April 2023 CIA Entry Renderings (PDF)
- 4 April 2023 CIA Entry Renderings opt (PDF)
- 4 April 2023 CIA Entry SEAF Part 1 Signed (PDF)
- 4 April 2023 CIA Entry Sign Permit Appl and rules (PDF)
- 4 April 2023 CIA Entry Site Plan (PDF)
- 4 April 2023 CIA Entry Site Plan Application (PDF)
Culinary Institute of America Hotel & Villas
- 1 June 2022 CIA Hotel 2.0 Site Plan Set (PDF)
- 1 June 2022 CIA Hotel 3.0 Architectural Set (PDF)
- 1 June 2022 CIA Hotel 4.0 FINAL FEAF REPORT (with attachments a-g) (PDF)
- 1 June 2022 CIA Hotel 5.1 Phase 1 Archeological part 1 (PDF)
- 1 June 2022 CIA Hotel 5.2 Phase 1 Archeological part 2 (PDF)
- 1 June 2022 CIA Hotel 6.0 Visual Assessment (PDF)
Dollar General 1 East Dorsey LN
- 21 October 2019 Dollar General 1 E Dorsey Plan Set (PDF)
- 4 September 2019 Dollar General 1 E Dorsey Landscape (PDF)
- 4 September 2019 Dollar General 1 E Dorsey Site (PDF)
- 25 November 2019 Dollar General (PDF)
- 21 July 2021 Dollar General color rendering (PDF)
- 21 July 2021 Dollar General Elevations (PDF)
- 21 July 2021 Dollar General Site Lighting Plans (PDF)
- 21 July 2021 Dollar General Revised Full Set (PDF)
- 21 July 2021 Dollar General Full EAF (PDF)
- 21 July 2021 Dollar General Site Lighting Plans (PDF)
- 21 July 2021 Dollar General Elevations (PDF)
- 21 July 2021 Dollar General Full Site Plan Set (PDF)
DS Electric Office
- 14 April 2023 DS Electric SIte Plan Set (PDF)
- 14 April 2023 DS Electric response letter (PDF)
- 14 April 2023 DS Electric Elevations (PDF)
- 9 March 2023 DS Electric LIGHTING PLAN (PDF)
- 27 February 2023 DS Electric ARCHITECTURALS (PDF)
- 27 February 2023 DS Electric EAF (PDF)
- 27 February 2023 DS Electric Site Plan (PDF)
- 27 February 2023 DS Electric Site Plan Application (PDF)
Gleason Family Properties
- 5 August 2021 Gleason Family Properties Site Plan revised 08.04.2021 (PDF)
- 10 June 2021 Gleason 517 SPT Site Plan Set (PDF)
- 10 June 2021 Gleaseon 517 SPT EAF Part 1 Rev 2021-06-02 (PDF)
- 16 March 2021 Gleason 517 SPT Narrative (PDF)
- 16 March 2021 Gleason 517 SPT EAF (PDF)
- 16 March 2021 Gleason 517 SPT Site Plan Set (PDF)
Hutchins Staatsburg Storage Amend Additional Units
- 24 June 2020 Hutchins Staatsburg Storage Site Plan Set (PDF)
- 02 March 2010 Hutchins Staatsburg Storage Add Units Site Plan Set (PDF)
- 20 August 2019 Huthins Staats Storage Graminski Plan Set (PDF)
- 20 August 2019 Hutchins Staats Storage Tinkelman Plan set (PDF)
- 21 May 2019 Hutchins Staats Storage 02 ELEV (PDF)
- 21 May 2019 Hutchins Staats Storage Civil Drawings Revised (PDF)
Hyde Park Town Center North Buildings 3, 4 & 5
Hyde Park Town Center North- Ready Coffee
- 25 May 2023 Ready Coffee Cover Letter (PDF)
- 25 May 2023 HPTC-N Ready Coffee Renderings Lighting Photometrics (PDF)
- 25 May 2023 HPTC-N Ready Coffee existing cond asbuilt EX1 (PDF)
- 25 May 2023 HPTC-N Ready Coffee L3 Planting and Wall Sepcifications (PDF)
- 25 May 2023 HPTC-N Ready Coffee L2 Plant Table (PDF)
- 25 May 2023 HPTC-N Ready Coffee L1 Planting Plan (PDF)
- 25 May 2023 HPTC-N Ready Coffee sds detal sp 3 (PDF)
- 25 May 2023 HPTC-N Ready Coffee sp 2 (PDF)
- 25 May 2023 HPTC-N Ready Coffee sp 1 (PDF)
- 25 May 2023 Ready Coffee Dumpster Photos (PDF)
- 4 April 2023 HPTCN Ready Coffee 10 Lighting Details LT2 (PDF)
- 4 April 2023 HPTCN Ready Coffee 13 Planting Sepcifications L3 (PDF)
- 4 April 2023 HPTCN Ready Coffee 12 Plant Table L2 (PDF)
- 4 April 2023 HPTCN Ready Coffee 11 Planting Plan L1 (PDF)
- 4 April 2023 HPTCN Ready Coffee 09 Lighting Plan LT1 (PDF)
- 4 April 2023 HPTCN Ready Coffee 08 Floor Plan AP3 (PDF)
- 4 April 2023 HPTCN Ready Coffee 07 Elevation AP2 (PDF)
- 4 April 2023 HPTCN Ready Coffee 06 Elevation AP1 (PDF)
- 4 April 2023 HPTCN Ready Coffee 05 SP3 (PDF) (2)
- 4 April 2023 HPTCN Ready Coffee 04 SP2 (PDF)
- 4 April 2023 HPTCN Ready Coffee 03 SP1 (PDF)
- 4 April 2023 HPTCN Ready Coffee 02 asbuilt (PDF)
- 4 April 2023 HPTCN Ready Coffee 01-T1-READY COFFEE TITLE (PDF)
- 4 April 2023 HPTCN Ready Coffee Cover Letter (PDF)
- 11 January 2023 HPTCN Ready Coffee Site Plan Set Elevations (PDF)
- 11 January 2023 HPTCN Ready Coffee Cover Letter (PDF)
- 11 January 2023 HPTCN Ready Coffee SEAF (PDF)
- 25 July 2022 HPTCN Ready Coffee EAF (PDF)
- 25 July 2022 HPTCN Ready Coffee L1 Landscaping Plan (PDF)
- 25 July 2022 HPTCN Ready Coffee L2 Landscaping Plant Table (PDF)
- 25 July 2022 HPTCN Ready Coffee LED Gooseneck Sign Light Specifications (PDF)
- 25 July 2022 HPTCN Ready Coffee Nichiha-Design-Review-Guide (PDF)
- 25 July 2022 HPTCN Ready Coffee Paint Exterior Brick White (PDF)
- 25 July 2022 HPTCN Ready Coffee Site Plan Sheet 1 of 14 (PDF)
- 25 July 2022 HPTCN Ready Coffee Site Plan Sheet 2 of 14 (PDF)
- 25 July 2022 HPTCN Ready Coffee Site Plan Sheet 3 of 14 (PDF)
- 25 July 2022 HPTCN Ready Coffee Site Plan Sheet 4 of 14 (PDF)
- 25 July 2022 HPTCN Ready Coffee Site Plan Sheet 5 of 14 (PDF)
- 25 July 2022 HPTCN Ready Coffee Site Plan Sheets 6-12 of 14 (PDF)
- 25 July 2022 HPTCN Ready Coffee WAC Outdoor Wall Sconce (PDF)
- 25 July 2022 HPTCN Ready CoffeeLighting (PDF)
- 25 July 2022 HPTCN Ready Coffee Cover Letter (PDF)
Hyde Park Quick Stop Convenience Store & Fueling
- 3 August 2022 Hyde Park Quick Stop Revised Site Plan (PDF)
- 3 August 2022 Hyde Park Quick Stop Response letter DOT submission drainage soils docs (PDF)
- 20 May 2022 Hyde Park Quick Stop Response Package (PDF)
- 20 May 2022 Hyde Park Quick Stop Plan (PDF)
- Revised EAF Hyde Park Quick Stop 03.16.2022 (PDF)
- 2 March 2022 Hyde Park Quick Stop Full EAF (PDF)
- 2 March 2022 Hyde Park Quick Stop Site Plan (PDF)
Jeffrey Groves Estates
- 16 November 2021 copy signed 2007 Plan Set (PDF)
- 16 November 2021 JGE-full EAF-Blair rd (PDF)
- 16 November 2021 JGE-HP-RSUB2 (PDF)
- 24 October 2018 JGE Site Plan (PDF)
- 24 October 2018 JGE Re-Subdivision Final Plat (PDF)
- January 23, 2018 Subdivision Plan Set Jeffrey Groves Estates Resub Subdivision 2018 04 SD SP (PDF)
- January 23, 2018 Site Plan Plan Set Set Jeffrey Groves Estates Resub 2018 04 SD SP (PDF)
- June 5, 2018 Site Plan Jeffrey Groves Estates Resubdivision (PDF)
- June 5, 2018 Arch Elevation Sheet Jeffrey Groves Estates Resub Plan A4 April 23, 2018 (PDF)
- April 3, 2018 Blandings Turtle Brochure Jeffry Grove Estates (PDF)
- April 3, 2018 Site Plan Jeffry Grove Estates (PDF)
- April 3, 2018 Threathened Endangered Species Report Jeffry Grove Estates (PDF)
- April 3, 2018 Wastewater Treatment Plant Elevation (PDF)
Key Construction Office/ Storage Units
- 17 January 2023 Key Construction SP Amendment Cover Letter (PDF)
- 17 January 2023 Key Construction SP Amendment Site Plan Set (PDF)
- 18 February 2022 Key Construction Cover Letter (PDF)
- 18 February 2022 Key Construction SWPPP (PDF)
- 18 February 2022 Key Construction Site Plan Set (PDF)
- 21 December 2021 Key Office Storage Units Site Plan Submission Set (PDF)
- 21 December 2021 Key Office Storage Units L1699 p144 Easement 02.17.86 (PDF)
- 21 December 2021 Key Office Storage Units Easement Map FM 12227 01.06.09 (PDF)
- 16 November 2021 Key Construction Cover Response Letter (PDF)
- 16 November 2021 Key Construction Signed Wetlands Map fr DEC (PDF)
- 16 November 2021 Key Construction SIte Plan Set (PDF)
- 16 November 2021 Key Construction SWPPP (PDF)
- 16 November 2021 Key Construction Wetland Buffer Impact Plan (PDF)
- 22 Septemeber 2021 Submission Key Construction Site Plan Set (PDF)
- 22 September 2021 Submission Key Construction Wetland Delineation Map (PDF)
- 3 August 2021 Key Construction 04 - feafpart1 08.03.21-Part F-Appendices (PDF)
- 3 August 2021 Key Construction 01 - Proposed (PDF)
- 3 August 2021 Key Construction 07 - Amended Site Plan Set 08.03.21 and LMV Drawings (PDF)
- 16 June 2021 Key Construction 1234 Route 9G Site Plan Set (PDF)
Marcoz/Chalk Residence
- 20 April 2023 Marcoz Chalk South West sides rendering (PDF)
- 20 April 2023 Marcoz Chalk South side rendering (PDF)
- 20 April 2023 Marcoz Chalk North West sides rendering (PDF)
- 20 April 2023 Marcoz Chalk North side rendering (PDF)
- 17 April 2023 Marcoz Chalk Site Plan Set 16 Poppinga Ln (PDF)
- 17 April 2023 Marcoz Chalk Architectural Set 16 Poppinga Lane (PDF)
- 27 March 2023 Marcoz Chalk 16 Poppinga Ln VARIANCE PLAN (PDF)
- 27 March 2023 Marcoz Chalk 16 Poppinga Ln SITE PLAN APPLICATION (PDF)
- 27 March 2023 Marcoz Chalk 16 Poppinga Ln SITE PLAN (PDF)
- 27 March 2023 Marcoz Chalk 16 Poppinga Ln GRADING- ESC PLAN ESC (PDF)
- 27 March 2023 Marcoz Chalk 16 Poppinga Ln FLood Plain DEV PLAN (PDF)
- 27 March 2023 Marcoz Chalk 16 Poppinga Ln FEAF with SHPO NO IMPACT DETERMINATION (PDF)
- 27 March 2023 Marcoz Chalk 16 Poppinga Ln Existing Conditions Plan (PDF)
- 27 March 2023 Marcoz Chalk 16 Poppinga Ln Cover letter (PDF)
- 27 March 2023 Marcoz Chalk 16 Poppinga Ln elevations (PDF)
Renaissance Rehabilitation
- 30 May 2023 Renaissance Rehab wall pack sconce specs (PDF)
- 30 may 2023 Renaissance rehab wall pack mullion canopy specs (PDF)
- 30 May 2023 Renaissance Rehab wall gooseneck specs (PDF)
- 30 May 2023 Renaissance Rehab Pole light specs Parking (PDF)
- 30 May 2023 Renaissance Rehab Site Plan (PDF)
- 30 March 2023 Renaissance Rehabilitation SP Application (PDF)
- 30 March 2023 Renaissance Rehabilitation Site Plan (PDF)
- 30 March 2023 Renaissance Rehabilitation SEAF Part 1 (PDF)
- 30 March 2023 Renaissance Rehabilitation Cover Letter (PDF)
Small-O'Malley Subdivision 148 Cream St
- 7 December 2022 Small OMalley Final Plat Set Owner change (PDF)
- 7 December 2022 Small OMalley Final Plat Application MinorSubdivision (PDF)
- 27 October 2022 revised OMalley Blandings Report (PDF)
- 28 October 2022 Final Plat Plan Set Small OMalley (PDF)
- 27 October 2022 revised Small OMalley Subdiv-FEAF (PDF)
- 23 August 2022 Coverletter Small OMalley SD (PDF)
- 23 August 2022 Revised EAF Small OMalley SD (PDF)
- 23 August 2022 Subdivision Plan Set Small OMalley (PDF)
- Phase 1B Survey Report Small OMalley SD 148 Cream street 03.30.2022 (PDF)
- 1 March 2022 Small OMalley SD SWPPP (PDF)
- 1 March 2022 Small OMalley SD Response letter (PDF)
- 1 March 2022 Small OMalley SD Final Plat (PDF)
- 1 March 2022 Small OMalley SD Archeological Phase 1A Report3-1 (PDF)
- 17 November 2021 Small OMalley SD 2021-55 Resource Context Map (PDF)
- 17 November 2021 Small OMalley SD 2021-55 Sketch Plan (PDF)
- 17 November 2021 Small OMalley SD 2021-55 EAF (PDF)
Verizon Wireless Tower 9G
- 17 May 2023 Verizon Wireless Tower 40A Response To NPV Comments (PDF)
- 16 March 2023 RF Engineer Response letter Verizon Celltower 9G St Andrews (PDF)
- 27 February 2023 Verizon response memo and ballon study results 9G St Andrews 02.27.2023 (PDF)
- 17 January 2023 Radio frequency Engineer review memo HydePark-Verizon-VioletAve-Route9G-PrelimRpt (PDF)
- 18 October 2022 Verizon Viewshed Maps (PDF)
- 18 October 2022 Verizon Tower 9G Revised Statement of intent (PDF)
- 18 October 2022 Verizon TCA Standards with Excerpt (PDF)
- 18 October 2022 Verizon Survey (PDF)
- 18 October 2022 Verizon Site Selection Analysis (PDF)
- 18 October 2022 Verizon Site Plan (PDF)
- 18 October 2022 Verizon Site Compliance Report (PDF)
- 18 October 2022 Verizon Removal Letter (PDF)
- 18 October 2022 Verizon FEAF (PDF)
- 18 October 2022 Verizon Engineering Necessity Case (PDF)
Winnakee Land Trust Lot-Line Alteration N Quaker
- 30 May 2023 Winnakee LotLine Alteration N Quaker Plat (PDF)
- 15 April 2023 Verizon Wireless 40A_Letter to PB with Inventory Report_20230511 (PDF)
- 3 May 2023 Winnakee Land Trust Lot-Line Alteration Sketch Plat (PDF)
- 3 April 2023 Winnakee Land Trust Lot-Line Alteration Sketch Application EAF N Quaker (PDF)
- 3 April 2023 Winnakee Land Trust Lot-Line ALteration N Quaker Sketch Plat (PDF)